Hi Wayne
On 15/03/2013 18:01, Wayne Beaton wrote:
What happens if I edit in the PMI, then my colleague edits the XML?
Then you will have two separate copies.The PMI stores the plan
information in a database. Drupal provides some revision control that
can be leveraged here.
When I did the import of the existing information, I pulled in project
plans where I could find them. It was a one-way process.
You must choose to either continue to run with an XML file, or you can
use the form elements in the PMI. There is no plan to attempt to
coordinate these.
How do I make that choice?
How is the choice enforced?
If there are two separate copies which is seen by the user?
If I choose XML, how is the PMI refreshed?
Regards
Ed Willink