On Wed, Jul 2, 2008 at 8:30 AM, johnf <[EMAIL PROTECTED]> wrote:
> Above the date control is a panel that contains a grid.  And the date control
> is in a panel with positioning based on a gridsizer.  I was hoping that the
> calendar would across the panel boundaries.


My problem as well.  It was especially bad for controls near the
bottom of a Form.


_______________________________________________
Post Messages to: [email protected]
Subscription Maintenance: http://leafe.com/mailman/listinfo/dabo-users
Searchable Archives: http://leafe.com/archives/search/dabo-users
This message: http://leafe.com/archives/byMID/[EMAIL PROTECTED]

Reply via email to