For your backup plan: If you have the space for all of your storage too, yea you can flush the whole server. Otherwise, you would need to backup your database. Save your DB logs (Definitely needed if your backup is online, sometimes needed if EEE). Save the outputs of db2set & set to a file, so you don't lose those configurations. I would also save the db & dbm configs to be safe. The database itself should not change until you run the "migrate database" command. Regarding the migration: We migrated from 5.2 FP13(EE Win nt 4.0) to 7.1 EEE Win 2000...no problem. Since DB2 keeps the database separate from the Software, it is easier. If you are changing OS, migrate NT to 2000 first (yes 5.2 is compatible). I would also get up to 5.2 fp13 first. I talked about this in Sonia Ang's & my IDUG presentation last May. The slides we used are on IBM's web (the CD is old..sorry): http://www-4.ibm.com/software/data/events/idugscaling.ppt -----Original Message----- From: DePratti, Roland A H05N [mailto:[EMAIL PROTECTED]] Sent: Wednesday, June 27, 2001 1:00 PM To: [EMAIL PROTECTED] Subject: DB2EUG: UDB Upgrade Backout Plan Hi all, I am new to the list and I am getting ready to upgrade one of our production NT boxes to UDB/NT V7.1 over the next few weeks (currently at V5.0). I am developing what the 'fallback' plan is, if for any reason I need to backpedal to the previous version (V5.0). I would be interested in ideas folks have on what they have done or plan to do for fallback. My current thoughts are: Prior to upgrading: Flush all transactions Shutdown databases Take Database backups Shutdown DB2 services Take NT Server backup to Tape If backout needed : Recover server from tape Start DB2 Services Start Databases Test Run Applications confirming fallback Thanks -- rd Roland DePratti CR&IS Architecture and Technology DBA Services 860-534-2245 [EMAIL PROTECTED] Confidential, unpublished property of CIGNA Do not duplicate or distribute Use and distribution limited solely to authorized personnel (c) Copyright 2001 (CIGNA) ---------------------------------------------------------------------------- -- CONFIDENTIALITY NOTICE: If you have received this e-mail in error, please immediately notify the sender by e-mail at the address shown. This e-mail transmission may contain confidential information. This information is intended only for the use of the individual(s) or entity to whom it is intended even if addressed incorrectly. Please delete it from your files if you are not the intended recipient. Thank you for your compliance. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ===== To unsubscribe, send 'unsubscribe' to [EMAIL PROTECTED] For other info (and scripts), see http://people.mn.mediaone.net/scottrmcleod ===== To unsubscribe, send 'unsubscribe' to [EMAIL PROTECTED] For other info (and scripts), see http://people.mn.mediaone.net/scottrmcleod
RE: DB2EUG: UDB Upgrade Backout Plan
Fortier, Christi (USPC.PCT.Hopewell) Fri, 29 Jun 2001 13:16:26 -0700
- DB2EUG: UDB Upgrade Backout Plan DePratti, Roland A H05N
- Fortier, Christi (USPC.PCT.Hopewell)
