I'm curious how long it would take to migrate this much data.

On 12/1/2006, "Rod K" <[EMAIL PROTECTED]> wrote:

>Tom,
>
>I'll do that.
>
>I think what I might do is shutdown dbmail-lmtpd and let postfix queue
>inbound but leave POP and IMAP running until the messageblk update is
>done.  Then shutdown IMAP and POP3, complete the migrate script and then
>start all under 2.2.
>
>Rod
>
>[EMAIL PROTECTED] wrote:
>> Could you replicate the database and test the upgrade to see just how
>> long it would take (if everything else hitting the database was off)?
>>
>> On 12/1/2006, "Rod K" <[EMAIL PROTECTED]> wrote:
>>
>>
>>> I'm currently running dbmail 2.0.11 on a live server with about 15GB of
>>> current email.  I need to upgrade to 2.2.
>>>
>>> The problem is that the postgres migrate script is going to take a long
>>> time to run with that much email and really, really don't want to take
>>> down the server for that long.  Is there any issues with leaving 2.0.11
>>> running while migration is going on or once complete before shutting
>>> down 2.0.11 and restarting with 2.2?
>>>
>>>
>
>_______________________________________________
>DBmail mailing list
>[email protected]
>https://mailman.fastxs.nl/mailman/listinfo/dbmail
>

Reply via email to