I've been trying to monitor the boost transition in hopes of being able to upload ICU 3.8 once it goes in. It looks like it's getting really close. Is that correct? I'm quite eager to go ahead and get ICU 3.8 uploaded to unstable because there are several other things that are waiting for this to happen. In particular, I'm holding xerces28 for ICU 3.8, and once that gets uploaded, I can work on transitioning packages from xerces27 to xerces28 (which doesn't cause a library transition since the two versions can coexist) and then removing xerces27. Also, new bugs are getting reported against ICU 3.6, and it would be better if I didn't have to try to resolve them without testing with ICU 3.8. If you think boost is going in soon and doesn't have any more hard problems blocking it, I'll continue to wait. Otherwise, if boost looks like it's stuck enough for ICU to join the party, I'd like to go ahead and upload. Thoughts?
-- Jay Berkenbilt <[EMAIL PROTECTED]> -- To UNSUBSCRIBE, email to [EMAIL PROTECTED] with a subject of "unsubscribe". Trouble? Contact [EMAIL PROTECTED]

