On 12.02.2013 13:08, Philipp Kern wrote:
On Sun, Feb 10, 2013 at 04:25:38PM +0000, Adam D. Barratt wrote:
We're somewhat overdue with the next Squeeze point release (6.0.7)
and
it'd be good to get it done before the wheezy release, so that we
can
pull in some upgrade fixes. As an opening gambit, some proposed
dates,
all of which appear to currently work for me:
February 23rd
March 2nd
March 9th
These all work for me. I will be sort of offline, however, from
February
14th to (including) 17th, which looks like the preparation range for
the
first date.
I think we've heard from everyone now, with there being a preference
for the 23rd from the CD perspective. That means we'd be looking at
closing p-u over the upcoming weekend, i.e. the 16 / 17th. That should
be doable, if a little tighter than I'd normally like, assuming we can
get the kernel upload done / accepted in time, to avoid last minute
panic over lkdi / d-i builds; CCing -kernel for opinions.
Regards,
Adam
--
To UNSUBSCRIBE, email to [email protected]
with a subject of "unsubscribe". Trouble? Contact [email protected]
Archive:
http://lists.debian.org/[email protected]