[ 
https://issues.apache.org/jira/browse/AMQ-3748?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Rob Davies reassigned AMQ-3748:
-------------------------------

    Assignee: Rob Davies
    
> ActiveMQEndpointWorker$1: Run method is synchronized
> ----------------------------------------------------
>
>                 Key: AMQ-3748
>                 URL: https://issues.apache.org/jira/browse/AMQ-3748
>             Project: ActiveMQ
>          Issue Type: Bug
>          Components: JCA Container
>    Affects Versions: 5.6.0
>         Environment: JBoss AS 7.1
>            Reporter: Thorsten Hoeger
>            Assignee: Rob Davies
>             Fix For: 5.6.0
>
>
> As posted in this mail [0] by Ed Keen there is a issue in the 
> ActiveMQEndpointWorker.
> I checked the spec the JBoss guys mentioned and in section 10.3.2 it is 
> clearly stated:
> "Both the run and release methods in the Work implementation may contain
> synchronization blocks but they must not be declared as synchronized methods."
> Removing the "synchronized" worked for some people trying this. But I think 
> it was added intentionally, so somebody should check an appropriate 
> alternative.
> This bug prevents ActiveMQ from being deployed on JBoss AS 7.1
> [0]: 
> http://mail-archives.apache.org/mod_mbox/activemq-users/201202.mbox/%3CCAC=rkz2XZmJo3D03kHG6nfz0c800-Mh=9JH6qb=zeGQyU=m...@mail.gmail.com%3E
> [1]: 
> http://download.oracle.com/otn-pub/jcp/connector_architecture-1.6-fr-oth-JSpec/connector-1_6-final-spec.pdf

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: 
https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to