[
https://issues.apache.org/jira/browse/AMQ-3748?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Rob Davies resolved AMQ-3748.
-----------------------------
Resolution: Fixed
Fixed by SVN 1295672
> ActiveMQEndpointWorker$1: Run method is synchronized
> ----------------------------------------------------
>
> Key: AMQ-3748
> URL: https://issues.apache.org/jira/browse/AMQ-3748
> Project: ActiveMQ
> Issue Type: Bug
> Components: JCA Container
> Affects Versions: 5.6.0
> Environment: JBoss AS 7.1
> Reporter: Thorsten Hoeger
> Assignee: Rob Davies
> Fix For: 5.6.0
>
>
> As posted in this mail [0] by Ed Keen there is a issue in the
> ActiveMQEndpointWorker.
> I checked the spec the JBoss guys mentioned and in section 10.3.2 it is
> clearly stated:
> "Both the run and release methods in the Work implementation may contain
> synchronization blocks but they must not be declared as synchronized methods."
> Removing the "synchronized" worked for some people trying this. But I think
> it was added intentionally, so somebody should check an appropriate
> alternative.
> This bug prevents ActiveMQ from being deployed on JBoss AS 7.1
> [0]:
> http://mail-archives.apache.org/mod_mbox/activemq-users/201202.mbox/%3CCAC=rkz2XZmJo3D03kHG6nfz0c800-Mh=9JH6qb=zeGQyU=m...@mail.gmail.com%3E
> [1]:
> http://download.oracle.com/otn-pub/jcp/connector_architecture-1.6-fr-oth-JSpec/connector-1_6-final-spec.pdf
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators:
https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira