Hello folks, When rolling upgrade HDP 2.2 to 2.3, HiveServer2 port is changed from 10000 to 10010. The same port change logic is in upgrade-2.4.xml as well.
But wouldn't this make no difference if I rolling upgrade a 2.3 cluster that was originally rolling upgrade from an HDP 2.2 cluster , where the port had already been changed to 10010? It'd be like changing the port from 10010 (on HDP 2.3) to 10010 (on HDP 2.4), right ? How does AmbariĀ handle Hive Server 2 port value change inĀ this continuously upgrade case? Thank you. Di Li