On 21/01/2011 15:30, Jeremy Hughes wrote:
On 21 January 2011 15:27, zoe slattery<[email protected]> wrote:
Hi - I'm having an interesting time with this. I have done all the work on
the branch to tidy it up but, to my surprise, when I ran the 'mvn
release:perform' step intending to release parent (which has to be released
before the others) it initiates the production and deployment of a full
snapshot - of the whole project.
This took 105 minutes and failed. It looks from the maven docs as though I
should possibly have deployed a snapshot before starting the release
I'm sure I didn't have to do this for 0.1. And even if it's necessary
it should only be necessary for the 'parent' module.
I don't think I did it for 0.2 either. I'm looking through maven
settings and the poms to see if there is something I've missed. The
release:perform initiates a checkout of everything into parent/target
and then starts building it from there. I definitely do not remember
this happening. Weird.
process. Does anyone know if this is a mandatory step? I'll clean up the
failure ready to start again.
Zoe