https://github.com/apache/beam/pull/4942 for anyone following.

On Thu, Mar 22, 2018 at 10:45 AM Lukasz Cwik <[email protected]> wrote:

> The maximum passing runtime was 70 mins in Gradle, so it seems reasonable
> to set it to 90 mins.
> For Maven, its about 130 mins so setting it to 150 mins is also reasonable.
>
> It turns out that ~1/8 in builds were aborted due to taking too long in
> both Maven / Java due to tests getting stuck.
> Would be worthwhile to set a maximum runtime per test to prevent this.
>
> Feel free to open a PR and send it my way.
>
>
> On Thu, Mar 22, 2018 at 10:14 AM Udi Meiri <[email protected]> wrote:
>
>> Hi,
>> I've been seeing increased wait times on Jenkins. It's frustrating to
>> wait 8h
>> <https://builds.apache.org/job/beam_PreCommit_Java_GradleBuild/3265/>
>> for a build, or 4h
>> <https://builds.apache.org/job/beam_PreCommit_Python_MavenInstall/3945/>
>> for it just to schedule.
>>
>> Data point:
>>
>> https://builds.apache.org/job/beam_PreCommit_Java_GradleBuild/buildTimeTrend
>> These builds seem to be timing out after 4 hours. Can we reduce the
>> timeout to just 1 hour?
>>
>>
>>

Attachment: smime.p7s
Description: S/MIME Cryptographic Signature

Reply via email to