I assume the proposal to do an RC first still stands, correct?
Hadrian
On 10/24/2011 08:26 AM, Christian Schneider wrote:
Sounds good to me.
I propose to aim for a release and vote in about a week.
Christian
Am 24.10.2011 13:55, schrieb Claus Ibsen:
Hi
Its almost 3 months since 2.8.0 was released
http://camel.apache.org/2011/07/25/camel-280-released.html
I think we should start considering a Camel 2.9.0 release. And thus I
suggest to start focusing on bug fixes, and unit test fixes etc.
And to keep an eye on CI servers to fix test and other issues reported
there.
Also I suggest to look at unresolved Camel 2.9.0 tickets in JIRA and
possible move tickets to 2.10 or 2.9.1 if that is possible.
Also if there is tickets which you think is a good/must have in 2.9.0
then I suggest to post here with the ticket numbers.
And of course to work on those tickets so they get resolved in the
near time.
We have 84 open tickets which has been assigned to 2.9.0. I think
that's too much and encourage you to look at those
and either move/fix the tickets so we can get this down to a
management number of tickets to be resolved in the near time.
Camel 2.9 open tickets:
https://issues.apache.org/jira/secure/IssueNavigator.jspa?sorter/field=issuekey&sorter/order=DESC