We usually do all the patch releases at roughly the same time, so I was
planning on doing that too.
Hadrian
On 11/18/2013 03:46 AM, Christian Müller wrote:
Not for me. I'm fine with the assigned issues for 2.12.2.
I'm wondering whether we should also release 2.11.3 in short term. I could
do this next week or so (comming back to a "normal" work load in my day
job...).
Best,
Christian
On Mon, Nov 18, 2013 at 1:54 AM, Hadrian Zbarcea <hzbar...@gmail.com> wrote:
There are test failure(s) I need to look at:
Are there any other issues you absolutely need in 2.12.2?
Hadrian
On 11/12/2013 08:11 PM, Willem jiang wrote:
+1,
BTW, it looks Camel 2.12.x is catch up the release cycle of Camel 2.11.x.
--
Willem Jiang
Red Hat, Inc.
Web: http://www.redhat.com
Blog: http://willemjiang.blogspot.com (http://willemjiang.blogspot.com/)
(English)
http://jnn.iteye.com (http://jnn.javaeye.com/) (Chinese)
Twitter: willemjiang
Weibo: 姜宁willem
On Wednesday, November 13, 2013 at 5:13 AM, Christian Müller wrote:
+1
Best,
Christian
On Tue, Nov 12, 2013 at 5:24 PM, Claus Ibsen <claus.ib...@gmail.com(mailto:
claus.ib...@gmail.com)> wrote:
On Mon, Nov 11, 2013 at 7:52 PM, Hadrian Zbarcea <hzbar...@gmail.com(mailto:
hzbar...@gmail.com)>
wrote:
I wanted to say the same thing. Maybe even sooner in the month. How
about
shooting to build the release end of this week. I can take care of this
release.
Hadrian
Yeah that works for me too. Just thought it was about time we cut a
new patch release for the 2.12 branch now that we have 100+ jiras
resolved.
On 11/11/2013 01:33 PM, Claus Ibsen wrote:
Hi
I think we should cut a new 2.12.2 release later this month. We have
so far 115 jira's resolved.
Any thoughts?
--
Claus Ibsen
-----------------
Red Hat, Inc.
Email: cib...@redhat.com (mailto:cib...@redhat.com)
Twitter: davsclaus
Blog: http://davsclaus.com
Author of Camel in Action: http://www.manning.com/ibsen