Hi,

all in all +1 from me. It would be good to have a period to stabilize
things (build, tests, etc). IMHO, the idea of an RC2 fits well for this.

Kind regards

On Tue, Jul 11, 2023 at 10:53 AM Claus Ibsen <claus.ib...@gmail.com> wrote:

> Hi
>
> I think it may be a good idea for us to do a RC2 before we do the 4.0 GA
> release.
>
> There has been some changes to the build system of the main branch, and
> many dependency upgrades (and some still to do) in both maven plugins and
> for components.
>
> All together I think it would be good to give time for doing a RC2 that
> allows us to catch and find issues ahead of time.
>
> So what if we aim for RC2 by the end of this month.
> And then cut 4.0 GA later in August.
>
> However it depends on the availability of Gregor. We can surely adjust the
> schedule.
> But I think the GA should be aimed to be GA in September; otherwise we
> postpone the release too long.
>
> Any thoughts?
>
>
> --
> Claus Ibsen
> -----------------
> @davsclaus
> Camel in Action 2: https://www.manning.com/ibsen2
>


-- 