I have prepared the RC2 release, but I have noticed that the build is
no longer creating "tarballs" of the main Camel distribution.

This is the staging repository for 4.0.0-RC2:
https://repository.apache.org/content/repositories/orgapachecamel-1592/

Normally, the tarballs would be located here:
https://repository.apache.org/content/repositories/orgapachecamel-1592/org/apache/camel/apache-camel/4.0.0-RC2/

Is it possible that the revent Maven updates caused this?

Thanks in advance,
Gregor

On Sun, Jul 23, 2023 at 9:51 AM Claus Ibsen <claus.ib...@gmail.com> wrote:
>
> On Sun, Jul 23, 2023 at 9:47 AM Claus Ibsen <claus.ib...@gmail.com> wrote:
>
> >
> >
> > On Sun, Jul 23, 2023 at 9:44 AM Gregor Zurowski <gre...@list.zurowski.org>
> > wrote:
> >
> >> Hi Claus,
> >>
> >> The branch is looking good, I am going to start with the release process
> >> now.
> >>
> >>
> > mvn release:prepare -Prelease -DdryRun
> >
> > [INFO] [ERROR] Failed to execute goal
> > org.apache.maven.plugins:maven-gpg-plugin:3.1.0:sign (default) on project
> > camel: Exit code: 2 -> [Help 1]
> > I have this error locally, I have a fix .. but need 5 min to complete the
> > build before pushing fix to main branch
> >
> >
>
>
> ok just pushed
> https://github.com/apache/camel/commit/2dc178385afe6163f4978113b63cd151e9b039a5
>
> Good luck with the release.
>
>
>
> >
> >
> >> Thanks,
> >> Gregor
> >>
> >> On Fri, Jul 21, 2023 at 2:58 PM Claus Ibsen <claus.ib...@gmail.com>
> >> wrote:
> >> >
> >> > Hi Gregor
> >> >
> >> > The main branch is ready for cutting 4.0.0-RC2.
> >> >
> >> >
> >> > On Tue, Jul 11, 2023 at 8:37 PM Gregor Zurowski <
> >> gre...@list.zurowski.org>
> >> > wrote:
> >> >
> >> > > Sounds good to me. I will be available for cutting RC2 by the end of
> >> > > this month. I am also available for the GA release in the first three
> >> > > weeks of August.
> >> > >
> >> > > Thanks,
> >> > > Gregor
> >> > >
> >> > > On Tue, Jul 11, 2023 at 10:53 AM Claus Ibsen <claus.ib...@gmail.com>
> >> > > wrote:
> >> > > >
> >> > > > Hi
> >> > > >
> >> > > > I think it may be a good idea for us to do a RC2 before we do the
> >> 4.0 GA
> >> > > > release.
> >> > > >
> >> > > > There has been some changes to the build system of the main branch,
> >> and
> >> > > > many dependency upgrades (and some still to do) in both maven
> >> plugins and
> >> > > > for components.
> >> > > >
> >> > > > All together I think it would be good to give time for doing a RC2
> >> that
> >> > > > allows us to catch and find issues ahead of time.
> >> > > >
> >> > > > So what if we aim for RC2 by the end of this month.
> >> > > > And then cut 4.0 GA later in August.
> >> > > >
> >> > > > However it depends on the availability of Gregor. We can surely
> >> adjust
> >> > > the
> >> > > > schedule.
> >> > > > But I think the GA should be aimed to be GA in September; otherwise
> >> we
> >> > > > postpone the release too long.
> >> > > >
> >> > > > Any thoughts?
> >> > > >
> >> > > >
> >> > > > --
> >> > > > Claus Ibsen
> >> > > > -----------------
> >> > > > @davsclaus
> >> > > > Camel in Action 2: https://www.manning.com/ibsen2
> >> > >
> >> >
> >> >
> >> > --
> >> > Claus Ibsen
> >> > -----------------
> >> > @davsclaus
> >> > Camel in Action 2: https://www.manning.com/ibsen2
> >>
> >
> >
> > --
> > Claus Ibsen
> > -----------------
> > @davsclaus
> > Camel in Action 2: https://www.manning.com/ibsen2
> >
>
>
> --
> Claus Ibsen
> -----------------
> @davsclaus
> Camel in Action 2: https://www.manning.com/ibsen2

Reply via email to