Can we change the freeze date to October 30th (Friday next week)? It would
be helpful
for us if we have 2 more days.

Best,
Kurt


On Mon, Oct 19, 2020 at 5:00 PM Robert Metzger <rmetz...@apache.org> wrote:

> Hi all,
>
> Dian and I would like to discuss a few items regarding the upcoming Flink
> 1.12 feature freeze:
>
> *A) Exact feature freeze day*
> So far, we've always said "end of October
> <https://cwiki.apache.org/confluence/display/FLINK/1.12+Release>" for the
> freeze. We propose (end of day CEST) October 28th (Wednesday next week) as
> the feature freeze time.
> We want to create RC0 on the day after the feature freeze, to make sure the
> RC creation process is running smoothly, and to have a common testing
> reference point.
>
>
>
> *B) What does feature freeze mean?*After the feature freeze, no new
> features are allowed to be merged to master. Only bug fixes and
> documentation improvements.
> The release managers will revert new feature commits after the feature
> freeze.
> Rational: The goal of the feature freeze phase is to improve the system
> stability by addressing known bugs. New features tend to introduce new
> instabilities, which would prolong the release process.
> If you need to merge a new feature after the freeze, please open a
> discussion on the dev@ list. If there are no objections by a PMC member
> within 48 (workday)hours, the feature can be merged.
>
> *C) When to cut the "release-1.12" branch off master?*
> In the last feature freeze, we had a pretty lengthy phase of maintaining
> the "master" and "release-1.11" branches with the same fixes. Therefore, I
> would like to propose an adjustment to the release process: We will have a
> stabilization phase on master, between the feature freeze and the branch
> cut.
> I expect this stabilization phase to last between 1 and 3 weeks, depending
> on the issues we find. Once all blockers are resolved, and no new blockers
> are surfacing, we can cut off the "release-1.12" branch and finalize the
> release.
> Is anybody in the community waiting for the cut off to happen sooner so
> that they can merge a big feature to Flink 1.13 ? (if that would be the
> case, then we can not have a stabilization phase)
>
>