Hello all, I was wondering, what timeframe most folks have in mind for getting 2.1 released?
I would like to be able to get Dojo 1.0 in as the only version that we include in the server - but rewriting everything to use the new widgets may take a while. Jay Jay D. McHugh (JIRA) wrote: > [ > https://issues.apache.org/jira/browse/GERONIMO-3300?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel > ] > > Jay D. McHugh updated GERONIMO-3300: > ------------------------------------ > > Description: > Dojo 1.0 is now available. > > But, to upgrade we will either need to rewrite all of the plugins that use > Dojo widgets to use the new (backward incompatible) versions -or- include > both the 0.4.3 and 1.0.0 versions of Dojo. > > Having both versions would make it possible to transition over to the newer > version of Dojo in a more leisurely fashion but would introduce a fairly > significant amount of bloat. > > I would prefer that we would just replace the old version and rewrite > whatever needs to be rewritten but that would depend on how soon we are > trying to get G2.1 out the door. > > was: > The new Dojo 0.9 Beta was just released. > > It will reduce the footprint of the main dojo.js to under 50k - But will > require that some of the console > screens to be reworked because the widget system was completely redesigned > and is incompatible. > > Affects Version/s: (was: 2.0-M7) > 2.1 > Summary: Upgrade Dojo to 1.0 (was: Upgrade Dojo to 0.9) > >> Upgrade Dojo to 1.0 >> ------------------- >> >> Key: GERONIMO-3300 >> URL: https://issues.apache.org/jira/browse/GERONIMO-3300 >> Project: Geronimo >> Issue Type: Improvement >> Security Level: public(Regular issues) >> Components: console >> Affects Versions: 2.1 >> Reporter: Jay D. McHugh >> Assignee: Jay D. McHugh >> >> Dojo 1.0 is now available. >> But, to upgrade we will either need to rewrite all of the plugins that use >> Dojo widgets to use the new (backward incompatible) versions -or- include >> both the 0.4.3 and 1.0.0 versions of Dojo. >> Having both versions would make it possible to transition over to the newer >> version of Dojo in a more leisurely fashion but would introduce a fairly >> significant amount of bloat. >> I would prefer that we would just replace the old version and rewrite >> whatever needs to be rewritten but that would depend on how soon we are >> trying to get G2.1 out the door. >
