[ 
https://issues.apache.org/jira/browse/GOBBLIN-1797?focusedWorklogId=849941&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-849941
 ]

ASF GitHub Bot logged work on GOBBLIN-1797:
-------------------------------------------

                Author: ASF GitHub Bot
            Created on: 09/Mar/23 01:10
            Start Date: 09/Mar/23 01:10
    Worklog Time Spent: 10m 
      Work Description: ZihanLi58 commented on code in PR #3656:
URL: https://github.com/apache/gobblin/pull/3656#discussion_r1130257877


##########
gobblin-service/src/main/java/org/apache/gobblin/service/modules/scheduler/GobblinServiceJobScheduler.java:
##########
@@ -312,15 +380,21 @@ private void scheduleSpecsFromCatalog() {
         try {
           individualGetSpecStartTime = System.nanoTime();
           Spec spec = this.flowCatalog.get().getSpecWrapper(uri);
-          this.individualGetSpecSpeedNanosValue = System.nanoTime() - 
individualGetSpecStartTime;
+          this.individualGetSpecSpeedValue = System.nanoTime() - 
individualGetSpecStartTime;
+          totalGetTime += this.individualGetSpecSpeedValue;
           addSpecHelperMethod(spec);
+          totalAddSpecTime += this.eachCompleteAddSpecValue; // this is 
updated by each call to onAddSpec
+          actualNumFlowsScheduled += 1;
         } catch (Exception e) {
           // If there is an uncaught error thrown during compilation, log it 
and continue adding flows
           _log.error("Could not schedule spec uri {} from flowCatalog due to 
", uri, e);
         }
-
     }
+    this.individualGetSpecSpeedValue = -1L;
 
+    this.totalGetSpecTimeValue = totalGetTime;
+    this.totalAddSpecTimeValue = totalAddSpecTime;

Review Comment:
   You might want to add some todo lists here to remove the metrics once the 
benchmark is done. For example, I don't think we want to report 
totalAddSpecTimeValue as metrics, a log makes more sense to me as we just set 
this value once and never change it





Issue Time Tracking
-------------------

    Worklog Id:     (was: 849941)
    Time Spent: 1h  (was: 50m)

> Skip scheduling flows far into future
> -------------------------------------
>
>                 Key: GOBBLIN-1797
>                 URL: https://issues.apache.org/jira/browse/GOBBLIN-1797
>             Project: Apache Gobblin
>          Issue Type: Improvement
>          Components: gobblin-service
>            Reporter: Urmi Mustafi
>            Assignee: Abhishek Tiwari
>            Priority: Major
>          Time Spent: 1h
>  Remaining Estimate: 0h
>
> The unschedule feature linked below sets a schedule to run Jan 1st of 2050 so 
> far in advance that it will "never run" 
> [https://jarvis.corp.linkedin.com/codesearch/result/?name=FlowConfigResourceLocalHandler.java&path=gobblin-elr%2Fgobblin-restli%2Fgobblin-flow-config-service%2Fgobblin-flow-config-service-server%2Fsrc%2Fmain%2Fjava%2Forg%2Fapache%2Fgobblin%2Fservice&reponame=linkedin%2Fgobblin-elr#62]
>  but potentially there are over 100k of these flows so we are loading and 
> scheduling many unnecessary flows. On initialization we add a check that 
> verifies the next run of the flow is within a certain time frame (100 days by 
> default) and loads it into the scheduler if it is within that time frame. We 
> choose that default value under the assumption that we will redeploy GaaS at 
> least every 100 days and then if we approach a far out scheduled flow we will 
> load it into the Scheduler. However, in most cases uses schedule flows for 
> near future or immediately and those will all be scheduled. This PR also 
> renames metrics and adds helpful new ones. 



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to