https://issues.apache.org/jira/browse/GOBBLIN-1797?focusedWorklogId=850176&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-850176
]
ASF GitHub Bot logged work on GOBBLIN-1797:
-------------------------------------------
Author: ASF GitHub Bot
Created on: 09/Mar/23 20:33
Start Date: 09/Mar/23 20:33
Worklog Time Spent: 10m
Work Description: Will-Lo merged PR #3656:
URL: https://github.com/apache/gobblin/pull/3656
Issue Time Tracking
-------------------
Worklog Id: (was: 850176)
Time Spent: 2h (was: 1h 50m)
> Skip scheduling flows far into future
> -------------------------------------
>
> Key: GOBBLIN-1797
> URL: https://issues.apache.org/jira/browse/GOBBLIN-1797
> Project: Apache Gobblin
> Issue Type: Improvement
> Components: gobblin-service
> Reporter: Urmi Mustafi
> Assignee: Abhishek Tiwari
> Priority: Major
> Time Spent: 2h
> Remaining Estimate: 0h
>
> The unschedule feature linked below sets a schedule to run Jan 1st of 2050 so
> far in advance that it will "never run"
> [https://jarvis.corp.linkedin.com/codesearch/result/?name=FlowConfigResourceLocalHandler.java&path=gobblin-elr%2Fgobblin-restli%2Fgobblin-flow-config-service%2Fgobblin-flow-config-service-server%2Fsrc%2Fmain%2Fjava%2Forg%2Fapache%2Fgobblin%2Fservice&reponame=linkedin%2Fgobblin-elr#62]
> but potentially there are over 100k of these flows so we are loading and
> scheduling many unnecessary flows. On initialization we add a check that
> verifies the next run of the flow is within a certain time frame (100 days by
> default) and loads it into the scheduler if it is within that time frame. We
> choose that default value under the assumption that we will redeploy GaaS at
> least every 100 days and then if we approach a far out scheduled flow we will
> load it into the Scheduler. However, in most cases uses schedule flows for
> near future or immediately and those will all be scheduled. This PR also
> renames metrics and adds helpful new ones.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)