On 9/15/06, Werner Punz <[EMAIL PROTECTED]> wrote:

Ok sorry for posting this in the Togago thread off topic.
Since the entire shared thing will be an ongoing discussion for longer
and Mike only has a negative vote as the only one as I saw in case of a
refork of 1.1.4.

Darn, and I answered over there before reading this.

Following proposal:

a) Push dojo down in after the 1.1.4 refork into Tom nevertheless

b) As soon as the shared situation is cleared up move it into the shared
base, with all infrastructure needed.

Yes.  And you don't need to wait for the re-branch to actually happen,
because with Subversion we can copy it from any revision.

Infrastructure wise, IMO it's fine to go ahead with the Dojo upgrade
on the Tomahawk 1.1.5-SNAPSHOT trunk, and start moving components out
of the sandbox.

After Core 1.1.4 is settled, I'll take a look at Tomahawk for 1.1.4.

Oh, and did I mention that every commit message needs a JIRA issue? :)

Thanks!
--
Wendy

Reply via email to