Hi,

As we’re a new TLP we’ll need to report monthly to the board for the next three 
months and our first report is due soon.

Draft board report
==============

Mynewt is a real-time operating system for constrained embedded systems like
wearables, lightbulbs, locks and doorbells. It works on a variety of 32-bit
MCUs (microcontrollers), including ARM Cortex-M and MIPS architectures.

## Issues:

There are no issues requiring board attention at this time.

## Activity:

- Just become a TLP. Move to TLP has been fairly smooth with minimal 
infrastructure issues.
- Took part in the Apache IoT track at ApacheCon Miami with 3 talks on Mynewt
- Work on how to report security issues
- Community work on porting to new platforms and supporting new languages 
(MicroPython) is on going

## Health report:

- PMC and committers are active
- Users questions and contributor's pull requests are dealt with in a timely 
manner

## PMC changes:

- Currently 19 PMC members
- Last PMC addition was everyone on 21st June

## Committer base changes:

- Currently 23 committers
- Last committer addition was Jacob Rosenthal on 13th June 2017

## Releases:

- Last release was 1.0 on March 22nd, 2017

## Mailing list activity:

- Activity down a little on list (no obvious reason why) compared to previous 
period but there's 26 new subscribers.

## JIRA activity:

- Activity about the same as previous period (100 odd JIRAs) with more JIRAs 
closed than raised.

==============

Has anyone got anything else to add or is there something else I’ve missed? 
There may be a few community growth things that I’ve missed (conferences, 
meetups etc)

BTW the report should be the work of the PMC as a whole and not just the chair.

Thanks,
Justin

 

Reply via email to