Swapnil Shah created OFBIZ-7172:
-----------------------------------

             Summary: Introduce Material Trace-ability at Inventory Item level 
on Production Run Declaration and Actual Material screen
                 Key: OFBIZ-7172
                 URL: https://issues.apache.org/jira/browse/OFBIZ-7172
             Project: OFBiz
          Issue Type: New Feature
            Reporter: Swapnil Shah
            Assignee: Divesh Dutta


Currently The projected material requirement over 'Production Run Declaration" 
screen and "Actual Material" screen don't work in sync.

It would help if The Inventory level details for projected material requirement 
based on BoM, start getting reflected over 'Actual Material' screen as well to 
track inventory against all required material at one place 

Similar inventory related information could be embedded over Declaration screen 
under "Material Required by Running Task" section by adding Inventory Item Id 
column that could show list of all InventoryItemIds against product on click of 
a button)

Please refer to attached screenshot for further reference.





--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to