Swapnil Shah created OFBIZ-7172: ----------------------------------- Summary: Introduce Material Trace-ability at Inventory Item level on Production Run Declaration and Actual Material screen Key: OFBIZ-7172 URL: https://issues.apache.org/jira/browse/OFBIZ-7172 Project: OFBiz Issue Type: New Feature Reporter: Swapnil Shah Assignee: Divesh Dutta
Currently The projected material requirement over 'Production Run Declaration" screen and "Actual Material" screen don't work in sync. It would help if The Inventory level details for projected material requirement based on BoM, start getting reflected over 'Actual Material' screen as well to track inventory against all required material at one place Similar inventory related information could be embedded over Declaration screen under "Material Required by Running Task" section by adding Inventory Item Id column that could show list of all InventoryItemIds against product on click of a button) Please refer to attached screenshot for further reference. -- This message was sent by Atlassian JIRA (v6.3.4#6332)