[
https://issues.apache.org/jira/browse/OFBIZ-7172?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Swapnil Shah updated OFBIZ-7172:
--------------------------------
Attachment: PRD_1.png
AM_1.png
> Introduce Material Trace-ability at Inventory Item level on Production Run
> Declaration and Actual Material screen
> -----------------------------------------------------------------------------------------------------------------
>
> Key: OFBIZ-7172
> URL: https://issues.apache.org/jira/browse/OFBIZ-7172
> Project: OFBiz
> Issue Type: New Feature
> Reporter: Swapnil Shah
> Assignee: Divesh Dutta
> Attachments: AM_1.png, PRD_1.png
>
>
> Currently The projected material requirement over 'Production Run
> Declaration" screen and "Actual Material" screen don't work in sync.
> It would help if The Inventory level details for projected material
> requirement based on BoM, start getting reflected over 'Actual Material'
> screen as well to track inventory against all required material at one place
> Similar inventory related information could be embedded over Declaration
> screen under "Material Required by Running Task" section by adding Inventory
> Item Id column that could show list of all InventoryItemIds against product
> on click of a button)
> Please refer to attached screenshot for further reference.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)