On Fri, Jun 10, 2016 at 3:20 PM, Alan Gates <[email protected]> wrote:
> So the plan is: > 1) Hive team doesn’t add any patches until step 3 below is completed. > 2) ORC releases Hive 1.1.1 with delta patch(es) between ORC 1.1.0 and Hive > master. > 3) You commit a patch to Hive master ripping out ORC and setting their pom > file to fetch ORC 1.1.1. > > Is that correct? Sounds rational. We should act as quickly as possible > to minimize the lock-out time on the Hive team. > Yes, that is what I was proposing. Thanks, Owen