On Fri, Jun 10, 2016 at 3:20 PM, Alan Gates <[email protected]> wrote:

> So the plan is:
> 1) Hive team doesn’t add any patches until step 3 below is completed.
> 2) ORC releases Hive 1.1.1 with delta patch(es) between ORC 1.1.0 and Hive
> master.
> 3) You commit a patch to Hive master ripping out ORC and setting their pom
> file to fetch ORC 1.1.1.
>
> Is that correct?  Sounds rational.  We should act as quickly as possible
> to minimize the lock-out time on the Hive team.
>

Yes, that is what I was proposing.

Thanks,
   Owen