Ian Boston wrote
> 
> I have done a patch[1] that reverts the changes and makes a release of all of 
> the above possible. It builds, release:prepare works (but needs base to be 
> released first so that server can bind to 2.0.6) and I have tested it in our 
> custom environment with all our Ruby based integration tests. I might have 
> missed something but there were no errors.
> 
> I would propose that we apply the patch (might be best if I do this from 
> git->svn so deletes/moves/renames behave), 
> release the items (Carsten?, just because your keys are better signed than 
> mine)
> and if it looks like the vote is going to pass (ie 3 committers have done 
> validation) 
> then revert the patch (I can do this git->svn) to allow JR2 move to happen.
> 
Sounds good to me with some additional comments :)

- I can do the releases
- We have to properly reschedule the jira issues (volunteer?)

And
> 908956 SLING-1366 : Use dynamic proxy to handle session#impersonate call.

I think this one should go into the release as this fixes a broken
implementation. There is currently a line in there which excludes the
pre jsr 283 interfaces. So we should remove this line.

Regards
Carsten

-- 
Carsten Ziegeler
[email protected]

Reply via email to