On 12 Feb 2010, at 12:03, Carsten Ziegeler wrote: > Ian Boston wrote >> >> I have done a patch[1] that reverts the changes and makes a release of all >> of the above possible. It builds, release:prepare works (but needs base to >> be released first so that server can bind to 2.0.6) and I have tested it in >> our custom environment with all our Ruby based integration tests. I might >> have missed something but there were no errors. >> >> I would propose that we apply the patch (might be best if I do this from >> git->svn so deletes/moves/renames behave), >> release the items (Carsten?, just because your keys are better signed than >> mine) >> and if it looks like the vote is going to pass (ie 3 committers have done >> validation) >> then revert the patch (I can do this git->svn) to allow JR2 move to happen. >> > Sounds good to me with some additional comments :) > > - I can do the releases > - We have to properly reschedule the jira issues (volunteer?)
I can do that, I dont think there are too many version changes. > > And >> 908956 SLING-1366 : Use dynamic proxy to handle session#impersonate call. > > I think this one should go into the release as this fixes a broken > implementation. There is currently a line in there which excludes the > pre jsr 283 interfaces. So we should remove this line. I'll have a look in a moment and update my patch. Ian > > Regards > Carsten > > -- > Carsten Ziegeler > [email protected]
