So much for being out of town for the long weekend. Thanks to my neighbours, I woke up to a waterlogged house, and am currently sitting amongst a fleet of industrial-grade dehumidifiers. This is not fun. My neighbours, of course, are away for the long weekend, no doubt having fun...
Anyway, the point of this message is to let folks know that, since I'm stuck here anyway, I've run the JUnit and Cactus tests on the Struts 1.2.3 build, on both JDK 1.3 and JDK 1.4, and all have succeeded. So I think we're in good shape. -- Martin Cooper On Sat, 4 Sep 2004 07:13:25 -0700 (PDT), Martin Cooper <[EMAIL PROTECTED]> wrote: > The Struts 1.2.3 build is up and announced, as proposed below. As you will > see from the wiki, I have not run unit tests. Unbelievably, just as I > started to do so last night, my power went out, and stayed out. (I hope > this isn't the start of another California power crisis...) Since we > needed to get this build out, I took the risk that everything is OK, and > am hoping that one of the other developers will be able to verify this and > update the wiki. I want to stress that this is not something I do lightly, > but unfortunately (for Struts, but not for me ;), I'm going to be out of > town over the long weekend and don't have time to follow up, and I do > feel that it's urgent that we get a 1.2.2 replacement out there. > > -- > Martin Cooper > > > > > On Wed, 1 Sep 2004, Martin Cooper wrote: > > > We need to get a follow-up 1.2.3 release out the door as soon as possible, > > due to the problems that have been identified with the 1.2.2 GA release. The > > ball is already in play for a 1.2.3 release, with a preliminary build > > available, and a release tracking page up on the wiki: > > > > http://wiki.apache.org/struts/StrutsRelease123 > > > > The proposed timeline for this release is as follows: > > > > * CVS freeze/tag date: Friday, September 3rd @ 6pm (Pacific time). The > > candidate build will be uploaded to cvs.a.o shortly thereafter, and > > announced to [EMAIL PROTECTED] and [EMAIL PROTECTED] for testing. > > > > * Initiation of Quality vote: Tuesday, September 7th. Duration of the > > vote will be the usual 72 hours. > > > > The strange dates and times have to do with (a) this coming weekend being a > > holiday weekend in the USA, and (b) my having prior arrangements for said > > holiday weekend. ;-) > > > > -- > > Martin Cooper > > > > --------------------------------------------------------------------- > > To unsubscribe, e-mail: [EMAIL PROTECTED] > > For additional commands, e-mail: [EMAIL PROTECTED] > > > > > > --------------------------------------------------------------------- > To unsubscribe, e-mail: [EMAIL PROTECTED] > For additional commands, e-mail: [EMAIL PROTECTED] > > --------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]