Yeah, I'd open up an xwork ticket and reference it in the Struts 2 ticket.
If you need commit access, just as Rainer.  If you commit to xwork, don't
forget to backport to the 2.0 and possibly the 1.2 branch as necessary.

Don

On 7/17/07, James Holmes <[EMAIL PROTECTED]> wrote:

I am working on some Struts 2 JIRA tickets that are ultimately XWork
changes/fixes and wanted to know what the protocol was for making the
changes. If
there is a ticket in the Struts 2 JIRA system, do I need to open a
corresponding XWork ticket as well so that the changes in XWork can be
tracked? I
assume this is the case and is what I did for a change I made this
morning. If this is not required, then it's less work, but I don't want to
skip this
step if it is the standard protocol.

If the protocol is to open corresponding XWork tickets, should I just copy
over the Struts 2 ticket info for the most part?

Thanks,

James

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]


Reply via email to