Kyriacos Sakkas schrieb:
I am currently running my full live load via GET request on the version
before the patch fixing the POST method. The wait is until me (or
someone else that can put some stress on it) confirms operation of the
current meta-data cvs under some sort of heavy load via POST as well as
GET, to confirm resilience. On my side that will happen sometime after
the first week of February.

ok, perfect... please keep us updated on the results, so we can consider merging the meta-data CVS branch to the main tree after we have a confirmed stress test.

Stipe

-------------------------------------------------------------------
Kölner Landstrasse 419
40589 Düsseldorf, NRW, Germany

tolj.org system architecture      Kannel Software Foundation (KSF)
http://www.tolj.org/              http://www.kannel.org/

mailto:st_{at}_tolj.org           mailto:stolj_{at}_kannel.org
-------------------------------------------------------------------

Reply via email to