Kyriacos Sakkas schrieb:
I am currently running my full live load via GET request on the version before the patch fixing the POST method. The wait is until me (or someone else that can put some stress on it) confirms operation of the current meta-data cvs under some sort of heavy load via POST as well as GET, to confirm resilience. On my side that will happen sometime after the first week of February.
ok, perfect... please keep us updated on the results, so we can consider merging the meta-data CVS branch to the main tree after we have a confirmed stress test.
Stipe ------------------------------------------------------------------- Kölner Landstrasse 419 40589 Düsseldorf, NRW, Germany tolj.org system architecture Kannel Software Foundation (KSF) http://www.tolj.org/ http://www.kannel.org/ mailto:st_{at}_tolj.org mailto:stolj_{at}_kannel.org -------------------------------------------------------------------
