Hi,

Update the current status of MM1 rc3 run preparation:

Schematic:
http://en.qi-hardware.com/wiki/Milkymist_One_Schematic_Change_History
we could face this as getting a rc3 schematic final review call email before
end of this week.

BoM and sourcing status:
http://en.qi-hardware.com/wiki/Milkymist_One_RC3_BOM
The date to finish all sourcing is less than 2 weeks from now on except 95
pcs pcb.

The current pcb design file ( routing ):
http://downloads.qi-hardware.com/hardware/milkymist_one/pcb/rc3/052311/rc3_design_20110523.tar.bz2

Layout changes histories:
* 'M' & 'cc-by-sa' log became bigger and texts changed to 1. Milkymist One
RC3 xxxxxxxx
  2. Copyleft Hardware Video Synthesizer
  3. www.milkymist.org
* added/deleted/changed parts, nets - pls ref. to schematic change history.

TODO:
* export MK1 microphone coordinates
* reduce J11's aperture of multilayer through holes to avoid of DC jack
wavered unbalancely while reflow and case met.
* add text "5V" and "GND" nearby TP33 and TP34 individually
* make a close area surrounding Y2 (HC-49SMD) with ground.
* add one more via on U4/U5  pin 8, U6's pin5 and pin 8 to provide driving
capability sufficiently
* change C253 , C255  silkscreen text to be same as normal one.
* move up J3 with 3.5mm to not interference MK1's two pins from vertical
placement.
* all changes also can reference rc2 known issues:
  http://en.qi-hardware.com/wiki/Milkymist_One_RC2_Known_Issues

please firstly ignore the DRC check rules, it's in more serious checks
though. We'll keep them until confirmed all and set the rules to the same
with rc2 before generating gerber.

Catch newest status, see
http://en.qi-hardware.com/wiki/Milkymist_One_run_3_schedule

-- 
Best Regards
adam
_______________________________________________
http://lists.milkymist.org/listinfo.cgi/devel-milkymist.org
IRC: #milkymist@Freenode
Twitter: www.twitter.com/milkymistvj
Ideas? http://milkymist.uservoice.com

Reply via email to