Hi Alex,

Your results are great!!
Thank you so much.
I want to confirm something.

Inter-AS Call(10)       1008
What is meaning of "10" ?

Inter-AS Call   980
Inter-AS Call (Low to High)     1050
Inter-AS Call (High to Low)     1463
Here, "Low and High" means the priority of process, right?
So without that, it means those two process have same priority. Is this
true?

Thank you.
Yuxin

On Sat, Oct 18, 2014 at 10:56 PM, Alexander Kroh <
[email protected]> wrote:

> Hi Yuxin,
>
> Below our our benchmark results. Figures are in cycles and do not include
> the cost of a the system call.
>
> Intra-AS Call   756
> Intra-AS ReplyWait      742
> Inter-AS Call   980
> Inter-AS ReplyWait      987
> Inter-AS Call (Low to High)     1050
> Inter-AS ReplyWait (High to Low)        1540
> Inter-AS Call (High to Low)     1463
> Inter-AS ReplyWait (Low to High)        1043
> Inter-AS Send   1043
> Inter-AS Call(10)       1008
> Inter-AS ReplyWait(10)  1015
>
>   - Alex
>
>
> ________________________________________
> From: Devel [[email protected]] on behalf of Yuxin Ren [
> [email protected]]
> Sent: Saturday, 18 October 2014 08:32
> To: [email protected]
> Subject: [seL4] IPC performance for slowpath
>
> Hi All,
>
> I find there have slow and fast path for IPC.
> I want to know the performance difference between those two.
> More accurate, on x86, how many cycles for slow path round-trip ipc
> between two address space?(on single core)
> And how many for fast path?
>
> Thank you very much.
>
> Yuxin
>
> ________________________________
>
> The information in this e-mail may be confidential and subject to legal
> professional privilege and/or copyright. National ICT Australia Limited
> accepts no liability for any damage caused by this email or its attachments.
>
_______________________________________________
Devel mailing list
[email protected]
https://sel4.systems/lists/listinfo/devel

Reply via email to