Tests no longer seem to be failing with the same symptom as previous iteration. Previously they failed during configuration phase to download dependencies.
I'll submit a few most post-commit suites, and if they are green tomorrow morning I think it'd be safe to merge. R: @lostluck [ Full content available at: https://github.com/apache/beam/pull/6453 ] This message was relayed via gitbox.apache.org for [email protected]
