Post-commit failures are test flakes rather than build breakages. I'm ready to 
conclude that the breakage we saw when this was initially merged was some 
reliability blip rather than actual breakage. I think this is ready to go in.

R: @lostluck @lukecwik 

[ Full content available at: https://github.com/apache/beam/pull/6453 ]
This message was relayed via gitbox.apache.org for [email protected]

Reply via email to