Post-commit failures are test flakes rather than build breakages. I'm ready to conclude that the breakage we saw when this was initially merged was some reliability blip rather than actual breakage. I think this is ready to go in.
R: @lostluck @lukecwik [ Full content available at: https://github.com/apache/beam/pull/6453 ] This message was relayed via gitbox.apache.org for [email protected]
