+1

On Sun, Feb 10, 2019 at 2:50 PM Vincent Massol <vinc...@massol.net> wrote:
>
> Hi devs,
>
> After TAKE 2 (see http://markmail.org/message/owtyhkmrz4tcbymn ),  and after 
> analyzing several modules (I analyzed about 4-5 in total), I think we should 
> improve a bit the strategy to make it usable and applicable.
>
> Lessons learnt
> ============
>
> * It takes a lot of time to analyze a single global tpc drop (every time it 
> takes me around 2 hours)
> * In general the results of the analysis are not that great. There are often 
> “good enough” reasons for the drop. It’s often a lack of unit tests and code 
> that is exercised by functional tests but the path has changed for various 
> reasons.
> * I find the ratio of time to spend on the analysis vs result to be too low.
> * In the end what’s important is that our global TPC continues to grow
>
> New Strategy
> ===========
>
> * We run the Clover Jenkins pipeline every night (between 11PM-8AM)
> * The pipeline sends an email whenever the new report has its global TPC 
> going down when compared with the baseline (vs one or more modules had their 
> TPC lowered in TAKE 2)
> * The baseline report is the report generated just after each XS release. 
> This means that we keep the same baseline during a XS release
> ** Technically it means that the pipeline will update the latest.txt file 
> (which contains the clover report timestamp) when it notices a version change
> * We add a step in the Release Plan Template to have the report passing 
> before we can release.
> * The RM is in charge of a release from day 1 to the release day (already the 
> case), and is also in charge of making sure that the global coverage job 
> failures get addressed before the release day so that we’re ready on the 
> release day.
> * Implementation detail: don’t send a failure email when there are failing 
> tests in the build, to avoid false positives
>
> WDYT?
>
> Thanks
> -Vincent



-- 
Thomas Mortagne

Reply via email to