Personally, I think we shouldn't worry about it. Still be mindful of usage
but we don't own Marvin an explanation or extra effot to help justify the
cost.

G Mike

On Thu, Aug 23, 2012 at 12:51 PM, clinton paetkau <[email protected]> wrote:

> also since i well no longer be spending any time at the space elevator use
> will drop drastically and this will reduceelectical consumption
>
>
>
> On Thu, Aug 23, 2012 at 12:47 PM, Adrian Stoness <[email protected]>wrote:
>
>> could be because of a meter reading being done recently and it was out
>> from what hydro was reading remind marvin of this we should start help to
>> insure the readings are updated to hydro regularly so these kinda bills
>> don't happen
>>
>> On Thu, Aug 23, 2012 at 12:33 PM, Justin Lacko <[email protected]> wrote:
>>
>>> One of our electrical bills came in and caused a bit of an issue with
>>> the owner, Marvin - it was $2500 and they are assuming a very large
>>> portion of that is our floor. They are upset that it is high.
>>>
>>> The reality is that they don't understand the bill, and there are a
>>> lot of misconceptions of what we do up here. Marvin complained that he
>>> leased us the space as offices, not as manufacturing (this is
>>> frivolous as he's making his own distinction on this and our lease
>>> says nothing to this effect) and that we're running heavy equipment up
>>> here 24/7. Mike Legary gave a rough estimate of our power consumption
>>> at max $750/mo. - nowhere near this bill. Mike and I are meeting with
>>> Marvin next Tuesday to clarify this issue.
>>>
>>> One thing that we need to do to make sure this situation does not
>>> occur is to be mindful of our power consumption in the space - I don't
>>> mean we need to cut back, but we have to understand that whatever we
>>> do costs money and we are responsible for ensuring that our costs
>>> don't skyrocket - otherwise the landlord WILL come back to us again.
>>> There is a misconception that AssentWorks draws a lot of power and it
>>> "must be them because of all that machinery" - in reality most of
>>> their machinery is only running for an hour a day, and SkullSpace
>>> actually uses more power than AssentWorks (the server room is probably
>>> costing us around $300/mo. to run). We can no longer be of the opinion
>>> that "since we don't pay for power, we can leave whatever we want
>>> running."
>>>
>>> Over the next few months our power situation will be transforming (pun
>>> intended) and our usage will change - but we will be responsible about
>>> this and everything will work out!
>>>
>>> Thanks,
>>> Justin
>>> _______________________________________________
>>> SkullSpace Discuss Mailing List
>>> Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss
>>> Archive: https://groups.google.com/group/skullspace-discuss-archive/
>>>
>>
>>
>> _______________________________________________
>> SkullSpace Discuss Mailing List
>> Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss
>> Archive: https://groups.google.com/group/skullspace-discuss-archive/
>>
>
>
> _______________________________________________
> SkullSpace Discuss Mailing List
> Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss
> Archive: https://groups.google.com/group/skullspace-discuss-archive/
>
_______________________________________________
SkullSpace Discuss Mailing List
Help: http://www.skullspace.ca/wiki/index.php/Mailing_List#Discuss
Archive: https://groups.google.com/group/skullspace-discuss-archive/

Reply via email to