Hey folks,

I stopped in the new space to drop a few things off and I decided I would
check a few repairs out.

First, The work that has been completed looks awesome. It is really coming
together. The team that preformed the move really got a lot done. Not
enough thanks can be given to the people who have taken a blight on Summit
St. and made it into a functional space.

Unfortunately I see a few issues (that may or may not be know to all)

1. The space is heated but it seemed warm. This is cool when hacking is
happening BUT expensive when it is not. We MUST work a plan together to
deal with lowering the heat when the space is not occupied. (I did not know
where the thermostat was to turn it down so I did not make any actions for
this.)

2. Above the back 40's heater is a GIANT HOLE. It appears to be a vent hole
and may already have a plan to be resolved BUT at the current moment $ is
flowing out the space. As the heater runs heat flows out and to the ceiling
and right next to the heater vent is this 8-12 inch hole. This must be
fixed ASAP.

3. The front garage door has large leaks of air. Replacement of the door
would be a more expensive project but buying weather trim and putting up a
plastic door (similar to the common space-back 40) would help considerably.)

4. There are numerous holes in the mortar that need filled.

When I was in the space previously I didn't see many of these issues as it
was dark outside but in the light of day they become VERY clear.

I have an album of pictures in an album I hope these help to clear things
up.

SynHak -
https://drive.google.com/folderview?id=0Bxw1KFspeHRrUHQzSFlfZ1Z1bzQ&usp=sharing


Once again GREAT JOB!

Much Love

Justin