Hello all,

   So far we have optimized a low salinity flooding  problem  ---based on the 
2pnc model--- we are working on from a wall time of 8000 s to 1500s. And we 
have noticed that the bulk of the time spent (over 90%) occurs during the 
assemble of the linear system to be solved. 

  Has anybody done an example parallelizing the assembler, either with threads 
or MPI? 

  Would this even be possible?

Any clues, pointers or examples would be greatly appreciated.

Kind regards,

Edscott


_______________________________________________
Dumux mailing list
[email protected]
https://listserv.uni-stuttgart.de/mailman/listinfo/dumux

Reply via email to