Well, after carefully reading the manual and noting that relay K3 should not be 
installed 
until after T2, I lost concentration and installed it by mistake. Is this a 
show stopper, 
requiring removal of the relay, or more to do with having enough room to solder 
T2 to 
the long pads etc?

Trevor  G0KTN

_______________________________________________
Elecraft mailing list
Post to: Elecraft@mailman.qth.net
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
 http://mailman.qth.net/mailman/listinfo/elecraft    

Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to