Speaking of cutoffs, I placed the parts orders for the 2nd run of LP-100 kits earlier this week. This is a limited run, similar to the initial run, but I still have some slots left. You can read about the LP-100 at www.telepostinc.com/lp100.html, with links to the QEX article, eHam.net reviews, assembly manual, etc.

This is a perfect accessory for a QRP to QRO station. I offer free NIST traceable calibration of the finished kits if desired (you pay only for shipping).

73,
Larry N8LP
www.telepostinc.com



Jack Smith wrote:
Just a short reminder that if you are planning to purchase a Z90 or Z91 panadapter kit, the deadline to drop me an E-mail message is Friday, August 18th.

A few days after the 18th, I will order enough of the expensive volume-sensitive parts (enclosures, LCD, PCB) to meet the order requirements, to provide for two or three units for my use and to provide a small quantity for spare parts support. This means that if you miss the August 18th cut-off date, you will have to wait until the next batch build, which may be a rather long time.

I can accept orders for small things, such as the interface boards, after the deadline date, up until I actually order those components.

73 de Jack K8ZOA
www.cliftonlaboratories.com
_______________________________________________
Elecraft mailing list
Post to: [email protected]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com



_______________________________________________
Elecraft mailing list
Post to: [email protected]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to