Speaking of cutoffs, I placed the parts orders for the 2nd run of LP-100
kits earlier this week. This is a limited run, similar to the initial
run, but I still have some slots left. You can read about the LP-100 at
www.telepostinc.com/lp100.html, with links to the QEX article, eHam.net
reviews, assembly manual, etc.
This is a perfect accessory for a QRP to QRO station. I offer free NIST
traceable calibration of the finished kits if desired (you pay only for
shipping).
73,
Larry N8LP
www.telepostinc.com
Jack Smith wrote:
Just a short reminder that if you are planning to purchase a Z90 or
Z91 panadapter kit, the deadline to drop me an E-mail message is
Friday, August 18th.
A few days after the 18th, I will order enough of the expensive
volume-sensitive parts (enclosures, LCD, PCB) to meet the order
requirements, to provide for two or three units for my use and to
provide a small quantity for spare parts support. This means that if
you miss the August 18th cut-off date, you will have to wait until the
next batch build, which may be a rather long time.
I can accept orders for small things, such as the interface boards,
after the deadline date, up until I actually order those components.
73 de Jack K8ZOA
www.cliftonlaboratories.com
_______________________________________________
Elecraft mailing list
Post to: [email protected]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com
_______________________________________________
Elecraft mailing list
Post to: [email protected]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com