Hello,

I am taking advantage of this holiday time to complete the ATU and 30M board 
for my KX1.  I have a quick question about the ATU install before I solder it 
in place.

I just installed the P1, P2 and P3 connectors and wonder if I took the "must be 
fully seated" warning in the directions a little too seriously.  I installed 
the long ends of P1, P2 and P3 as far as they would go into the J6, J7 and J8 
connectors.  When I did this, there was a gap between the plastic part of the J 
connectors and the P connectors where you could see the metal connector. I gave 
the plastic on the P connectors a push and while the pins did not go in 
further, the plastic moved down and closed the gap. 

I then put the ATU in place and it fits, but I think it might hang too low. The 
directions say to make sure that nothing is touching..and I think I am in good 
shape except for the possibility of a toroid hitting R28.  I am not sure I can 
move it enough. It hard to see to the back of the board and verify everything 
though.

Did I get a little too enthusiastic?  Is that "gap" ok?  If so,  how much 
should the gap be and I will see if I can get it back.

I finished the paddles this week and hope to get this ATU installed today.  It 
is supposed to be 50 and sunny tomorrow.  I could try my first outside QSO with 
the rig.

Any and all help appreciated!  

73 de Keith KB3ILS
_______________________________________________
Elecraft mailing list
Post to: [email protected]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
 http://mailman.qth.net/mailman/listinfo/elecraft    

Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to