Greetings,
 
K3/100 assembly in work.  I just did the four resistance checks that verify the 
power buses are not shorted to ground.  All R measurements exceeded the 
minimums specified.  However, that kind of leaves a big range of what 
constitutes "nominal" values.  Can anybody provide what are typically nominal 
values for these?  Below are what I measured on my particular K3 with respect 
to minimums required.
 
1. 12VDC IN connectors.  Required: >50K ohms   Measured: >20M ohms (out of 
range)
 
2. Between R36 (test point) and ground.  Required: >150 ohms   Measured: 234 
ohms.
 
3. Between U12 (test point) and ground.  Required: >500 ohms   Measured: 4.8K 
ohms.
 
4. Between U13 (test point) and ground.  Required: >150 ohms   Measured: 423 
ohms.
 
Thanks much.  Any advice appreciated.
 
Walter, N0DZJ


      
_______________________________________________
Elecraft mailing list
Post to: [email protected]
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
 http://mailman.qth.net/mailman/listinfo/elecraft    

Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to