Hi, all concerned:

The time from key-down to rf-available, is well-defined, and controllable
with the DELAY knob from 8ms to 2s.

Is the time from key-up to no r-f output as well-defined, and controllable?

My concern is hot-switching an amplifier, in my case either a Ten-Tec 425 or
an Alpha 89, operating QSK c-w.

After key-up, on quiet bands or a dummy load, I hear a short "tail" (sounds
like an echo) at the end of each code element.

Is the situation different on SSB?

Any ideas out there, please?

Tia & brgds,
Dave, N3HE
-- 
View this message in context: 
http://n2.nabble.com/K3-R-T-and-T-R-timing-tp4804248p4804248.html
Sent from the Elecraft mailing list archive at Nabble.com.
______________________________________________________________
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[email protected]

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html

Reply via email to