Erik;

I have used IEC 1000-4-4:1995. EN should be muich the same.

In section 8.2 "Execution of the test" - "The test plan shall specify" - 
"sequence of application of the test voltage to the EUT's ports, each one after 
the other or to cables belonging to more than one circuit, etc." 

I have understood this to mean that we test each "port" [generally one 
connector or cable] sepatately, ["one at a time, one after the other"]. 
Sometimes one "port" consists of one cable with connections going to more than 
one circuit, in this case we test that cable as a whole ["cables belonging to 
more than one circuit, etc." ]. 

I would be interested how others do this.

Ray Hulinsky



RCIC - http://www.rcic.com
Regulatory Compliance Information Center




---------
This message is coming from the emc-pstc discussion list.
To cancel your subscription, send mail to [email protected]
with the single line: "unsubscribe emc-pstc" (without the
quotes).  For help, send mail to [email protected],
[email protected], [email protected], or
[email protected] (the list administrators).

Reply via email to