Posted for: [email protected]
:-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-) Ed Price [email protected] Electromagnetic Compatibility Lab Cubic Defense Systems San Diego, CA. USA 619-505-2780 (Voice) 619-505-1502 (Fax) Military & Avionics EMC Services Is Our Specialty Shake-Bake-Shock - Metrology - Reliability Analysis :-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-):-) > -----Original Message----- > From: [email protected] [SMTP:[email protected]] > Sent: Tuesday, November 16, 1999 8:18 AM > To: [email protected] > Subject: Re: Central Office Equip. tested to UL 1950 > > > I believe the correct clause your test lab. referred > be 6.2.1.2 instead of 6.4.1. Per sub-clause 6.4.1, > you don't need to do the test you described in the > email, all you need is either dielectric or impulse > test. However, per sub-clause 6.2.1.2, if your > product don't provide basic insulation between TNV-3 > and SELV, accessible conductive part, TNV-1 or TNV-2 > circuits per Table 19. You need to meet three > conditions as stated per 6.2.1.2. And one of them > require the test you described. Hope that help! If > you need any more help, you can email me anytime. > > K.K. > > RCIC - http://www.rcic.com > Regulatory Compliance Information Center > > --------- This message is coming from the emc-pstc discussion list. To cancel your subscription, send mail to [email protected] with the single line: "unsubscribe emc-pstc" (without the quotes). For help, send mail to [email protected], [email protected], [email protected], or [email protected] (the list administrators).

