NFPA 99 (Health Care Facilities)Chapter 12 (Hospital Requirements) section
12-3 may give some insight. I do not know of a "documented" time interval
for such tests. I do know that some of the larger institutions specify 1
year (their policy)to perform a hy-pot, chassis leakage and ground ohms
tests. Hope this helps! 

-----Original Message-----
From: [email protected] [mailto:[email protected]]
Sent: Tuesday, September 21, 1999 9:42 AM
To: [email protected]
Subject: Field Safety Tests






We want to suggest to our field service technicians a fair time interval
during
which to perform periodical safety test on installed medical devices.

Has anybody out of there any relevant standard reference or suggestion
coming
from experience?

Thanks in advance.

m.p.


---------------------------------------------------------
ESAOTE S.p.A.                      Massimo Polignano
Research & Product Development     Design Quality Control
Via di Caciolle,15                 tel:+39.055.4229402
I- 50127 Florence                  fax:+39.055.4223305
        e-mail: [email protected]



---------
This message is coming from the emc-pstc discussion list.
To cancel your subscription, send mail to [email protected]
with the single line: "unsubscribe emc-pstc" (without the
quotes).  For help, send mail to [email protected],
[email protected], [email protected], or
[email protected] (the list administrators).


---------
This message is coming from the emc-pstc discussion list.
To cancel your subscription, send mail to [email protected]
with the single line: "unsubscribe emc-pstc" (without the
quotes).  For help, send mail to [email protected],
[email protected], [email protected], or
[email protected] (the list administrators).

Reply via email to