NFPA 99 (Health Care Facilities)Chapter 12 (Hospital Requirements) section 12-3 may give some insight. I do not know of a "documented" time interval for such tests. I do know that some of the larger institutions specify 1 year (their policy)to perform a hy-pot, chassis leakage and ground ohms tests. Hope this helps!
-----Original Message----- From: [email protected] [mailto:[email protected]] Sent: Tuesday, September 21, 1999 9:42 AM To: [email protected] Subject: Field Safety Tests We want to suggest to our field service technicians a fair time interval during which to perform periodical safety test on installed medical devices. Has anybody out of there any relevant standard reference or suggestion coming from experience? Thanks in advance. m.p. --------------------------------------------------------- ESAOTE S.p.A. Massimo Polignano Research & Product Development Design Quality Control Via di Caciolle,15 tel:+39.055.4229402 I- 50127 Florence fax:+39.055.4223305 e-mail: [email protected] --------- This message is coming from the emc-pstc discussion list. To cancel your subscription, send mail to [email protected] with the single line: "unsubscribe emc-pstc" (without the quotes). For help, send mail to [email protected], [email protected], [email protected], or [email protected] (the list administrators). --------- This message is coming from the emc-pstc discussion list. To cancel your subscription, send mail to [email protected] with the single line: "unsubscribe emc-pstc" (without the quotes). For help, send mail to [email protected], [email protected], [email protected], or [email protected] (the list administrators).

