Cohorts.
I may be missing the obvious here.
I have a small UPS heading to Dubai. The requirement is for a British
style fused plug. The UPS itself, is ungrounded and smack full of agency
approvals.
When I asked the vendor for a power cord he provided two, one with the
ground pin, and the hot and neutral pins. The ground pin isn't connected to
anything at the equipment end. The second configuration, and the one I
anticipated getting, didn't have the ground pin on the input, or wall outlet
side of the power cord.
Maybe I'm missing something obvious here, but I see no application for
a floating ground pin on the wall outlet side of this connector given that it
isn't carried through to the equipment which it is powering?
What am I missing?
Gary
-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.
Visit our web site at: http://www.ewh.ieee.org/soc/emcs/pstc/
To cancel your subscription, send mail to:
[email protected]
with the single line:
unsubscribe emc-pstc
For help, send mail to the list administrators:
Ron Pickard: [email protected]
Dave Heald: [email protected]
For policy questions, send mail to:
Richard Nute: [email protected]
Jim Bacher: [email protected]
All emc-pstc postings are archived and searchable on the web at:
http://ieeepstc.mindcruiser.com/
Click on "browse" and then "emc-pstc mailing list"