In my experience UL always required to block one side at a time, and offered to try to shorten the test time by blocking all. Not a requirement by any means.
Leo Simon Consulting Compliance Engineer EMC Corporation 80 South St. Hopkinton, MA 01748 Tel 508-249-5022 Fax 508-249-5500 From: [email protected] [mailto:[email protected]] On Behalf Of Robert Johnson Sent: Tuesday, November 25, 2003 10:56 AM To: [email protected] Subject: Blocked ventillation testing I have been requested by UL-HongKong to the blocked ventillation abnormal testing with all vents on all side blocked simultaneously. My previous experience has been that one side is blocked at a time. Blocking more than one side at a time was considered multiple faults. If it passes blocking all vents at once shortens test time, but is this method necessary? What is the experience of others? Bob Johnson ITE Safety This message is from the IEEE EMC Society Product Safety Technical Committee emc-pstc discussion list. Visit our web site at: http://www.ieee-pses.org/ To cancel your subscription, send mail to: [email protected] with the single line: unsubscribe emc-pstc For help, send mail to the list administrators: Ron Pickard: [email protected] Dave Heald: [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc This message is from the IEEE EMC Society Product Safety Technical Committee emc-pstc discussion list. Visit our web site at: http://www.ieee-pses.org/ To cancel your subscription, send mail to: [email protected] with the single line: unsubscribe emc-pstc For help, send mail to the list administrators: Ron Pickard: [email protected] Dave Heald: [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc

