UL tends to view conformal coating as part of an insulation system, but this is not a requirement according to UL60950-1.
Even if not required for spacing, you still must perform all Type Tests using conformal-coated PWBs, and the material should be described in the FUS report. If you do not want to always CC the PWB, carefully select which Type Tests are to be repeated using PWBs both with and without CC. This will demonstrate that CC should not affect the system safety. The UL specialist for insulation systems is Mr. A.J. Baig. He will be able to determine if UL1446 even scopes this issue... luck, Brian -----Original Message----- From: Sotherden, Jim (IndSys, GEFanuc, NA) [ mailto:[email protected]] Sent: Tuesday, December 16, 2003 6:24 AM To: [email protected] Subject: question concerning conformal coating of PWB If we have some of our boards conformal coated, As long as we use a recognized conformal coating, does the process have to be under a follow-up service ? The boards are not coated because of spacing, but rather because of customer request. I tried to contact UL but could get no straight answer. Thanks, Jim Sotherden Agency Coordinator/Test Engineer