Group

I'm trying to get my head around NEBS requirements.

>From what I can deduce, most NEBS requirments seem to assume that product
is installed in a CO building or outside in a 3rd part enclosure.

I'm trying to clarify the requirements for product that has an integral
enclusure, that is (in my words) it "is" Outside Plant as opposed to being
a product that is "installed in" Outside Plant.

The product is a metal box with integral heatsink. 48V DC and RF OBSAI
fiber optic inputs and antenna port output.

The new GR-3108 seems to be for product that is installed in OP.

Can anyone advise what the relevant standard would be.

regards
Charlie

-

This message is from the IEEE Product Safety Engineering Society
emc-pstc discussion list.    Website:  http://www.ieee-pses.org/

To post a message to the list, send your e-mail to [email protected]

Instructions:  http://listserv.ieee.org/listserv/request/user-guide.html

List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:

     Scott Douglas           [email protected]
     Mike Cantwell           [email protected]

For policy questions, send mail to:

     Jim Bacher:             [email protected]
     David Heald:            [email protected]

All emc-pstc postings are archived and searchable on the web at:

    http://www.ieeecommunities.org/emc-pstc

Reply via email to