Group I'm trying to get my head around NEBS requirements.
>From what I can deduce, most NEBS requirments seem to assume that product is installed in a CO building or outside in a 3rd part enclosure. I'm trying to clarify the requirements for product that has an integral enclusure, that is (in my words) it "is" Outside Plant as opposed to being a product that is "installed in" Outside Plant. The product is a metal box with integral heatsink. 48V DC and RF OBSAI fiber optic inputs and antenna port output. The new GR-3108 seems to be for product that is installed in OP. Can anyone advise what the relevant standard would be. regards Charlie - This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. Website: http://www.ieee-pses.org/ To post a message to the list, send your e-mail to [email protected] Instructions: http://listserv.ieee.org/listserv/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas [email protected] Mike Cantwell [email protected] For policy questions, send mail to: Jim Bacher: [email protected] David Heald: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc

