You potentially have a very good point there, Bob.

 

However, the standards do usually state (dare I say) a “reference method”,
whereby they state things like “where the cable length requirements cannot
be made...etc, etc, then bundle.”  (I am not quoting a particular standard
here, just what I recall as being typical words.)  The implication of such
statements is to meet the cable length requirements is preferable.  So they
may not tell you to cut the cable, but they never tell you not to cut the
cable, so cutting the cable isn’t a deviation.

 

Even if it a lab chose to see cutting the cable as a deviation, technical
justification kicks in with the likely outcome that such a deviation would be
acceptable.

 

Best Regards,
John

 

From: Robert Heller [mailto:[email protected]] 
Sent: 09 February 2011 10:02
To: [email protected]
Subject: Re: [PSES] EUT power cord length

 

<[email protected]> wrote on 02/09/2011 02:47:49 AM:
> From:
> "John Davies, Blackwood Labs" <[email protected]>
> To:
> <[email protected]>
> Date:
> 02/09/2011 02:48 AM
> Subject:
> RE: [PSES] EUT power cord length
> Sent by:
> <[email protected]> 
>
> If the customer doesn't want us to cut his cable, then it's a deviation 
> from the standard and all deviations must be judged on an individual 
> basis as to whether or not they are technically justifiable to demonstrate 
> compliance with the standard.   

But if the standard permits bundling and doesn't say anything about cutting 
the cable then cutting the cable is a deviation from the standard. 

Bob Heller
-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://product-compliance.oc.ieee.org/
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 

For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 


-- 
This message has been scanned for viruses and 
dangerous content by MailScanner <http://www.mailscanner.info/> , and is 
believed to be clean. 

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. To post a message to the list, send your e-mail to
<[email protected]>

All emc-pstc postings are archived and searchable on the web at
http://product-compliance.oc.ieee.org/
Graphics (in well-used formats), large files, etc. can be posted to that URL. 

Website: http://www.ieee-pses.org/
Instructions: http://listserv.ieee.org/request/user-guide.html
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <[email protected]>
Mike Cantwell <[email protected]> 

For policy questions, send mail to:
Jim Bacher <[email protected]>
David Heald <[email protected]> 


Reply via email to